All resources

What a commercial water room contains

Last reviewed November 18, 2026 · 7 min read

The short answer

A commercial water room holds filtration, filtered water storage, stock tanks for concentrates, batch tanks for mixed solution, the fertigation skid and the valve manifold that routes it all. In the 30 sheet sample set it takes 14 of the 30 sheets: three on floor plan and elevations, two on filtration, three on fertigation and the valve manifold, and six on batch tanks alone. The pipe fitting schedule behind one water room runs to several hundred line items, including 196 one inch socket elbows and 1,323 feet of one inch schedule 80 PVC.

Fourteen sheets of thirty

In a 30 sheet set covering a whole cultivation facility, the water room takes fourteen. That ratio is the thing to notice. The grow rooms get fifteen sheets between them across flower, veg, moms and the hallway, and the room nobody photographs gets almost as many.

Water room sheets in a 30 sheet set
RangeSheetsCovers
WR1.01 to 1.033Floor plan and elevations
WR2.01 to 2.022Water filtration, including an exploded view
WR3.01 to 3.033Fertigation and the valve manifold
WR4.01 to 4.066Batch tanks: elevations, isometric, colour coded perspective, exploded detail

Six sheets on batch tanks looks excessive until somebody has to plumb them. One of those six is a colour coded perspective, which exists so a plumber can tell at a glance which line is fill, which is feed, which is recirculation and which is drain. Another is an exploded detail, which is the sheet the assembly is actually built from.

What is in the room

Equipment, in sequence
StageEquipment
IncomingSupply isolation, water filter
StorageTwo 750 gallon filtered water tanks
ConcentratesSix 55 gallon stock tanks
DosingFertigation pump and skid
Mixed solutionSix 300 gallon batch tanks, each with pump, recirculation, drain and master valve
RoutingValve manifold out to the rooms
DrainageFloor drain, overflow to drain, batch tank to drain

Drainage is the stage that gets left off early drawings and causes the most trouble late. The sample filtration sheet carries a dedicated overflow drainage detail, with a line from the batch tanks to drain and an overflow to drain, running to a floor drain. A water room is a room where things overflow, and the drawing has to say where that water goes.

The part level

The title sheet of the set carries four schedules: pipe fittings, pipe accessories, pipe, and flex pipe. Between them they are the bill of materials for the room. A sample of what is on them:

Selected lines from the water room schedules
ItemQty or length
1 inch socket elbow, 90 degree196
1 inch male adapter, MPT to socket100
Techlock elbow, 5/8 inch66
Techlock male adapter, 3/4 to 5/8 inch66
Solenoid valve31
Low flow control zone, 1 inch32
Bulkhead, 1 inch28
1 inch schedule 80 PVC1,323 ft
16 and 17 mm PE tubing1,956 ft
1-1/2 inch schedule 80 PVC146 ft

That is what down to the part number means. A schedule at this level either matches what gets built or it does not, and the difference shows up on site as a plumber waiting on a fitting.

Common questions

What is a water room in a cannabis facility?

The room that holds filtration, filtered water storage, stock tanks of concentrate, batch tanks of mixed solution, the fertigation skid and the valve manifold that routes feed to each grow room. In the sample 30 sheet set it takes 14 sheets, more than any single grow room.

How big should a water room be?

It is sized by the equipment rather than by a rule of thumb. The sample room holds two 750 gallon storage tanks, six 55 gallon stock tanks and six 300 gallon batch tanks, each batch tank with a pump, recirculation, drain and master valve, plus access around all of it.

Why does a water room need six sheets on batch tanks?

Because the tanks are an assembly, not a purchase. The six cover elevations from two directions, an isometric, a colour coded perspective that identifies fill, feed, recirculation and drain lines at a glance, a perspective view, and an exploded detail that the assembly is built from.

How much pipe is in a commercial water room?

On the sample schedule, 1,323 feet of 1 inch schedule 80 PVC, 146 feet of 1-1/2 inch, and 1,956 feet of 16 and 17 millimetre PE tubing, alongside several hundred fittings including 196 one inch elbows.

How we put this together

Sheet counts, ranges and titles are read off the sheet list on the title and parts sheet of the EES 30 sheet cultivation and water room set. Part quantities are read off the pipe fitting, pipe accessory and pipe schedules on that same sheet.