What to ask for before you accept a cultivation design quote
The short answer
Ask for the sheet index before you ask for the price. The index tells you what the set will decide for you and what it will leave to the installer, and that difference is usually larger than the difference between two quotes. Then check six things: a placement plan and a details sheet for every system, the canopy drawn at every position it can occupy, fertigation drawn as a P&ID rather than only a plan, schedules with part numbers and quantities rather than categories, elevations for every room, and a title block naming who drew it and who checked it.
Ask for the index first
A sheet index is one page and it is free. It lists every drawing the set will contain, which means it lists every decision the set will make. Two quotes at a similar price can differ by fifteen sheets, and the fifteen sheets are where the change orders live.
For reference, a set that settles what goes in each room runs to around 18 sheets. A set that settles how it gets built, with room elevations, isometrics, exploded irrigation views and a water room package, runs to around 30.
The six checks
| Check | If it is missing |
|---|---|
| A placement plan and a details sheet for every system | Either the positions or the part numbers are being left to the installer |
| The canopy drawn at every position it can occupy | Nobody has checked that rolling benching clears the fans and columns |
| Fertigation as a P&ID, not only a plan | The order of operations and the valve states are undefined |
| Schedules with part numbers and quantities | The room has been estimated from a rate, not drawn |
| Elevations for every room | Vertical conflicts between lights, fans, mains and racking are unresolved |
| A title block naming who drew and who checked | No one has signed it |
Questions worth asking out loud
- How many sheets, and can I see the index?
- Is the fan layout sized on throw distance against the canopy, or on air changes per hour?
- Does the under canopy quote include splitters, junction boxes and the communication lines, or only fixtures and a controller?
- What is the connected load of what you have specified, by system?
- Is the fertigation batch or inline, and why that one for this building?
- Does every room have a flush zone and both spigots?
- How many fittings are in the water room?
- Who checks the drawings, and are they the same person who drew them?
What a quote cannot tell you
Two things are worth checking outside the document. The first is whether the people drawing it have run a room, which shows up in small places: a flush zone, two spigots per room, a colour coded perspective of the batch tanks for the plumber. The second is what happens after handover, because a set is the start of a build and the build is the start of an operation.
A design quote that cannot say who supports the facility afterwards is quoting a document. The document is the cheap part.
Common questions
How many sheets should a cultivation design set have?
Around 18 for a set that settles what goes in each room, and around 30 for one that settles how it is built, including room elevations, isometrics, exploded irrigation details and a water room package. Ask for the sheet index before the price.
What questions should I ask a cannabis facility designer?
How many sheets and can I see the index; whether airflow is sized on throw or air changes; whether the under canopy quote includes the cabling and splitters; the connected load by system; whether fertigation is batch or inline and why; whether every room has a flush zone and both spigots; the fitting count in the water room; and who checks the drawings.
How do I know if a design quote is complete?
Check for a placement plan and a details sheet for every system, the canopy drawn at every position it occupies, fertigation drawn as a P&ID, schedules with part numbers and quantities rather than categories, elevations for every room, and a title block naming who drew and who checked it.
Why does the canopy need to be drawn more than once?
Rolling benching occupies more than one position. A grid that clears a fan, a column or a downspout at rest can foul it once rolled, so the set should draw the resting position and the roll positions separately.
How we put this together
The checklist is derived from what is and is not present on released EES sets, an 18 sheet approval set and a 30 sheet detail set, both published in full in the layout library on our Technical Services page.
Elevated produces cultivation design sets and would be one of the parties a quote is requested from.